挪威
基督教Houge
风力发电场
Hitra 2风电场
Hitra 2风电场 is located in Hitra in Trøndelag county.
-
2019投入使用
-
94 MW装机容量
-
290妇女和年生产
The wind farm is an expansion of the 24 turbine Hitra风电场, which has been in operation since 2004. The Hitra 2风电场 consists of 26 turbines and has an installed capacity of 93.6 MW.
The wind farm is part of the Fosen Vind project, Europe’s largest onshore wind project. Construction started in 2018, and the wind farm has been operational since the end of 2019. Read more about the Fosen Vind project here.
公司 | 所有权份额 |
mg游戏官方网站 | 52.1% |
北欧风力发电协会 | 40% |
TrønderEnergi | 7.9% |
Hitra
每一个博文
Hitra风电场